4 pcs mild steel pillar
2 pcs mild steel beam
3 pcs roof frame
Step 1 (the foundation) :-
Erect the 2 pillars
Then the beam.
Weld them.
Repeat above for the other 2 pillars and beam.
Step 2 :-
These are the frames for the roof.
The polycarbonate sheets will be later fastened on these.
Hoist the 2nd section.
And finally the 3rd section.
Welding required to joint all 3 sections of the roof frame.
The completed foundation and roof frame.
Some painting work required.
1st layer of anti-rust paint.
2nd (outer) layer of ICI.
Marklon polyglass polycarbonate hollow sheets (comes with 10 years warranty).
Fasten and secure the sheets onto the roof frame.
The result (tadaaaa) :-
Pre-Installation .........
Pre Installation.................
Post Installation...................
~